Click Here To Send Rutland County Council Planning Your Comments before the 15th February 2013
Application details | |||
---|---|---|---|
Reference number | APP/2013/0004 | Application Type | Major Application Type |
Site address | Land West Of Uppingham Road Oakham Rutland |
Proposal | Proposed housing development and associated works including provision of access onto Uppingham Road, Oakham. |
Received Date | 10/01/2013 | Valid date | 10/01/2013 |
Status | Pending Decision | Decision date | |
Committee Type | Delegated | Committee Date | |
Agent name | Mr Richard Dunnett | Case Officer | Nick Hodgett |
Agent address | 1 Meridian South Meridian Business Park LEICESTER LE19 1WY |
Applicant name | |
Calculated Fee | 25029.00 | Parish | OAKHAM |
Eastings | 486233.31 | Northings | 308093.91 |
Consultation Start Date | 22/01/2013 | Consultation End Date |
15/02/2013 |
Date | Description | Filename |
---|---|---|
15/01/2013 | Visibility Splays | Visibility Splays.pdf |
15/01/2013 | Archaelogical Assessment Report | Archaelogical Assessment Report.pdf |
15/01/2013 | Conditions | Conditions.pdf |
15/01/2013 | Design Code | Design Code.pdf |
15/01/2013 | Detail Layout Plan | Detail Layout Plan.pdf |
15/01/2013 | Document Schedule | Document Schedule.pdf |
15/01/2013 | Foul Water Drainage Sections 1 | Foul Water Drainage Sections 1.pdf |
15/01/2013 | Foul Water Drainage Sections 2 | Foul Water Drainage Sections 2.pdf |
15/01/2013 | Hard Landscaping Scheme | Hard Landscaping Scheme.pdf |
15/01/2013 | House Type Pack | House Type Pack.pdf |
15/01/2013 | Indicative Street Scene | Indicative Street Scene.pdf |
15/01/2013 | Kerbs and Surfacing 1 | Kerbs and Surfacing 1.pdf |
15/01/2013 | Kerbs and Surfacing 2 | Kerbs and Surfacing 2.pdf |
15/01/2013 | Kerbs and Surfacing 3 | Kerbs and Surfacing 3.pdf |
15/01/2013 | Kerbs and Surfacing 4 | Kerbs and Surfacing 4.pdf |
15/01/2013 | Phasing Plan | Phasing Plan.pdf |
15/01/2013 | Planning Application Form | Planning Application Form.pdf |
15/01/2013 | Proposed Drainage 1 | Proposed Drainage 1.pdf |
15/01/2013 | Proposed Drainage 2 | Proposed Drainage 2.pdf |
15/01/2013 | Proposed Drainage 3 | Proposed Drainage 3.pdf |
15/01/2013 | Proposed Drainage 4 | Proposed Drainage 4.pdf |
15/01/2013 | Proposed Levels 1 | Proposed Levels 1.pdf |
15/01/2013 | Proposed Levels 2 | Proposed Levels 2.pdf |
15/01/2013 | Proposed Levels 3 | Proposed Levels 3.pdf |
15/01/2013 | Proposed Levels 4 | Proposed Levels 4.pdf |
15/01/2013 | Road Longsections Reference Plan | Road Longsections Reference Plan.pdf |
15/01/2013 | Site Sections | Site Sections.pdf |
15/01/2013 | Soft Landscaping Scheme A | Soft Landscaping Scheme A.pdf |
15/01/2013 | Soft Landscaping Scheme B | Soft Landscaping Scheme B.pdf |
15/01/2013 | Soft Landscaping Scheme C | Soft Landscaping Scheme C.pdf |
15/01/2013 | Surface Water Drainage Sections 1 | Surface Water Drainage Sections 1.pdf |
15/01/2013 | Surface Water Drainage Sections 2 | Surface Water Drainage Sections 2.pdf |
15/01/2013 | Topographical Survey | Topographical Survey.pdf |
15/01/2013 | Tree and Hedgerow Retention and Removal | Tree and Hedgerow Retention and Removal.pdf |
15/01/2013 | Typical Road Sections | Typical Road Sections.pdf |
15/01/2013 | Vehicle Swept Paths - Large Refuse Vehicle | Vehicle Swept Paths - Large Refuse Vehicle.pdf |
15/01/2013 | Vehicle Swept Paths FTA 1998 Design | Vehicle Swept Paths FTA 1998 Design.pdf |
22/01/2013 | Public Protection - 22-01-2013 | Public Protection - 22-01-2013.pdf |
24/01/2013 | Waste Services - 24-01-2013 | Waste Services - rec'd 24-01-2013.pdf |
24/01/2013 | Mr Gerald Botteley - 24.01.2013 | Mr Gerald Botteley - 24.01.2013.pdf |
25/01/2013 | R Clarke - 25/1/2013 | R Clarke - 25 Jan 2013.pdf |
28/01/2013 | Mr Martin Brookes - 28-01-2013 | Mr Martin Brookes - 28-01-2013.pdf |